PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued installing the elevator guide rails at Elev. 1,2,3 Facing North.jpg Started pressure testing the 1st floor gas piping.jpg Started pressure testing the copper piping at the 2nd floor Facing East.jpg Stated welding metal angles around the Monumetnal Stairs Facing East 1.jpg Installed insulation around the Lower Roof walls Facing West.jpg Installed motorized dampers at the 4th floor Facing North.jpg Stated welding metal angles around the Monumetnal Stairs Facing East 2.jpg Continued caulking the stone panels at the South Elevation.jpg Continued waterproofing the shear wall at the South Elevation.jpg